Missions Home Building Project

Footer & Block work

 

Concrete floor

Drywall

Electrical

Footer and Block work

Insulation

Log stairs

Miscellaneous

Plumbing

Porches

Removing roof

Septic system

Youth Groups

-----

Celebration party

-----

Start of Construction Photos

List of Volunteers

Ministry Photos

 

 

 

 

Elisabeth and Isaac check out the excavation machine

 

 

 

 

 

 

 

Len Bittinger and his family laid all the block

 

 

 

 

 

It took lots of volunteers to move the block around

 

 

Len was a perfect craftsman

 

 

 

 

 

Men and ladies helped to pour the columns solid

 

 

Parging the walls was not easy.

 

 

 

 

 

This cement mixer that was loaned to us was a great help.

 

 

 

Return to Home Page

Click on photo to enlarge.

 

 

Isaac Elise chuck on machine.jpg (130893 bytes)

 

 

 

 

DSCF0045.JPG (321413 bytes)

DSCF0065.JPG (18831 bytes)

 

 

 DSCF0028.JPG (323138 bytes)

 

Block work (3).JPG (324573 bytes)

 

Block work (6).JPG (319306 bytes)

 

DSCF0042.JPG (335836 bytes)

DSCF0072.JPG (337276 bytes)

 

 

Ministry Photos

Family News   About us   Prayer and Prayer letters Be a Part of the Work

 

  How to Contact us   Response Page  Take a Missions Test  Ministry Photos

 

Return to Home Page